In the heart of Dubai, in the prestigious Downtown area, stands Address Grand Downtown – a luxury residential project by Emaar Properties that combines urban living with international hotel-level service. The project offers panoramic views of the Burj Khalifa and the Arabian Gulf, while ensuring the highest level of finish in both interior design and architecture.
The apartments at Address Grand Downtown include 3, 4, and 5-bedroom units, along with unique duplex apartments. All units are well-equipped, providing a functional and modern living space. Residents enjoy personalized concierge services, a state-of-the-art gym, and an adults-only infinity pool – all designed to offer a holistic experience that blends comfort, style, and quality of life.
Apartment Types and Area Specifications
The project features a range of residential units in various sizes and levels of luxury:
- 3-bedroom apartments (built-up area 4,106–4,398 sq ft) – starting from AED 10.86M
- 3-room duplex apartments (5,618–5,626 sq ft) – starting from AED 23.73M
- 4-bedroom apartments (4,803–4,806 sq ft) – starting from AED 17.14M
- 5-bedroom apartments (9,608 sq ft) – starting from AED 39.08M
- 5-bedroom apartments with pool (9,608 sq ft) – starting from AED 39.30M
- 5-bedroom duplex apartments (11,093 sq ft) – starting from AED 51.70M
Additionally, a graded and flexible payment plan is offered over several years, ensuring a convenient purchasing process for both investors and those looking to acquire a luxurious home in a central and unique location.
Payment Schedule (Down Payment at Signing):
- 10% in April 2025 (1st Instalment)
- 5% in October 2025 (2nd Instalment)
- 10% in April 2026 (3rd Instalment)
- 10% in October 2026 (4th Instalment)
- 5% upon completion of 40% of construction (April 2027) (5th Instalment)
- 10% upon completion of 60% of construction (October 2027) (6th Instalment)
- 10% upon completion of 80% of construction (April 2028) (7th Instalment)
- 30% upon completion of 100% of construction (October 2028) (8th Instalment)
The construction and completion dates are estimates and may change if necessary.